Oman Sohar Project GTG22 Foundation Concrete Pouring Completed: Sepco

Announced Date :  Jun 19, 2017


On Feb. 17th, Oman Sohar project GTG22 foundation concrete pouring completed with totally 615 cubic meters.
Before the pouring, project department checked the embedded parts location, elevation and vertical and other factors, and the template size, patchwork and flatness strictly to ensure that the basis of the geometric size meet the requirements. At the same time, the project organized the relevant departments and subcontractors to make sure the technical specifications and quality control points.

There are three pumps pouring and one stand by. After pouring, project recorded the temperature of concrete strictly according to the requirements to accumulate data for the follow-up work. 

You can receive free Monthly news and insights from ResearchViews delivered straight to your inbox – sign up below:

* Indicates Mandatory
*Name:  
*Company:  
*Email:    
*Country:  
*Phone Number:          
Comments:
  captcha refresh
Enter Captcha Code:    

Send to friend

*Your EmailID:    
Message:
*Friend's EmailID:    
  captcha refresh
Enter Captcha Code: